Skip to content

— Articles

LOD 100–500: how detailed should a model be

Levels of Development in the BIMForum LOD Specification: how far you can rely on a model element at each level.

During a project the model becomes more precise step by step. To agree on what can be taken from an element at each stage, teams use LOD (Level of Development). One of the most widely used references is the BIMForum LOD Specification.

One element — a wall with a window — from LOD 100 to LOD 400 (diagram).
One element — a wall with a window — from LOD 100 to LOD 400 (diagram).
LevelElement in the modelUsed for
LOD 100A symbol or generic representation; not geometry, information is approximateEarly area and volume estimates
LOD 200A generic system, object or assembly; quantity, size, shape and location approximateSketch, concept
LOD 300A specific object: quantity, size, shape, location and orientation measurable from the modelDesign and construction drawings
LOD 350LOD 300 plus interfaces with other building systems (supports, connections)Cross-discipline coordination
LOD 400Detail sufficient for fabrication, assembly and installationFabrication, installation
LOD 500A field-verified representationAs-built model, operation

Two important notes

  • LOD is not the same as level of detail. In the specification, detail is what goes into an element, while level of development is how far the team can rely on it.
  • LOD 500 is not the next step in a progression — it marks field verification, so the specification describes LOD 100–400 in detail.

In practice LOD is set per element, not for the whole model: walls may be at LOD 300 while facade cladding is at LOD 200. Record this in the BIM Execution Plan (BEP).

Source

More articles

We accept

UzcardHumoVisaMastercard

Payment takes place on the payment system’s protected page and is confirmed with 3D Secure. Card details are not stored on our site.