Web · construction schedule
BIMFab 4D
Construction schedule from a Revit model — day-by-day 3D
Open an IFC file in the browser — the app builds the work schedule, calculates durations and crew sizes from norms, shows the building day by day and produces the calendar schedule in the form of ШНҚ 3.01.01-22, Annex 5.
Open 4D ↗Free trial · the file is not uploaded to a server · computer, phone, tabletGuide
6 steps, each with a screenshot. The “In the video” button opens the video at that point.
-
Open the IFC file
Export the model from Revit to IFC and click “Open IFC” or “Choose file” — several disciplines are fine (AR, KJ, OV, VK, EOM). The file is read in the browser itself and is not uploaded to a server. To try it first, open the sample project — no sign-up needed; sign in to use your own file. In the Revit export, turn on “Split walls, columns, ducts by level” and “Export base quantities”, and use the same coordinate base in every discipline.
-
Work schedule from the model
The app groups elements by discipline, type and storey and builds the task list and links itself: preparation, excavation, foundation, the frame of each storey, walls, windows and doors, roof, building services, finishes and landscaping. Task name, duration and predecessor (FS, SS, FF and lag) are edited in the right panel.
-
Auto-plan: durations and crews
“Auto-plan” multiplies the model quantities by resource estimate norms (ШНК 4.02 construction, ШНК 4.17 installation; advisory since 2023) and calculates labour, crew size and days for each task. Two modes: by crew size or by finish date. Concrete curing breaks (walls after the frame) and shifts are taken into account; values you enter manually take priority.
-
Day-by-day 3D, plan and actual
Drag the timeline or press ▶ — the model shows that day’s state: built, in progress and not yet started elements in different colours. In “Actual” mode you enter real dates — delays and the forecast appear; the critical path is marked on the chart. If upper-storey elements would be built before the frame below them, the app warns you and offers “Fix”.
-
Section box and walkthrough
Cut the building from any side with the X-Y-Z section box; point coordinates are shown. In “Walk” and “Fly” modes you move inside the building: WASD and mouse on a keyboard, a joystick on a phone.
-
Calendar schedule — Excel and PDF
Calendar schedule per ШНҚ 3.01.01-22, Annex 5 (Form 1): work quantities, labour, machinery, duration, shifts, crew size, crew composition and a chart by ten-day periods — Excel (.xlsx) and print (PDF). Save the schedule and continue later: up to 3 projects per account (“My projects”).
What you get
Sample project — a 10-storey office building: the calendar schedule produced after applying Auto-plan, every sheet.
Calendar schedule — print
ШНҚ 3.01.01-22, Annex 5, Form 1: work quantities, labour, machinery, duration, workers, crew composition, a chart by ten-day periods and workforce over time.
FAQ
Is the IFC file uploaded to a server?
No. The file opens in your browser. When you save, only the schedule (tasks, durations, links) is stored on the server — not the model itself.
How accurate are the durations?
Labour is calculated from norms, but the result is advisory: it depends on model quality, crew size and site conditions. For each project a specialist reviews it and adjusts it manually if needed.
Is the number of machines calculated too?
Machine hours come from the norms; the number of machines is currently calculated for earthworks (excavator). Cranes and other plant are entered manually.
Does it work on a phone?
Yes — it opens on phones and tablets too; an on-screen joystick lets you walk through the building. A computer is more comfortable for large models.
Try BIMFab 4D now
Free trial · the file is not uploaded to a server · computer, phone, tablet